2024 updates

December 2024

  • Development has commenced.
  • All Plots 1-9 have commenced construction.
  • Plots 1 and 2 have their foundations constructed.
  • Plots 3-9 have their slabs constructed and are at ground floor level.
  • The agreed tree protection fencing is in situ.

November 2024

Development has commenced.

  • The two conservatories have been removed from the existing building;
  • The roadways have commenced construction;
  • Earthworks have been undertaken on site to obtain the land levels required.
  • The agreed tree protection fencing is in situ.