2024 updates
December 2024
The piling work in Phase 1 of the build is continuing, alongside the installation of the required drainage.
November 2024
The engineering works on the land in Phase 1 continue.
September 2024
The contractor continues to carry out the engineering works on the land in Phase 1 to level and prep it for the forthcoming construction of the dwellings.
The drainage construction continues.